EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
EH-SlingTSI
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (112)
Research
- (3)
-
EAA TA visit
-
Visiting Sasha and...
-
Went for a ride
Workshop
- (1)
-
Started setting up -...
Empennage
- (30)
-
The tail feathers...
-
Finally done!
-
Finished the elevator!
-
Got some help with...
-
Putting the...
-
More help riveting
-
First test fit of...
-
Elevator Trim Tab
-
Future me will thank...
-
Starting work on the...
-
Bought some lights
-
(Almost) Finishing...
-
Finished up the...
-
Vertical stabilizer,...
-
Build the vertical...
-
Started building the...
-
Just bought a VOR...
-
Finished the...
-
Started work on the...
-
Tried to close up...
-
Getting closer on...
-
Starting to assemble...
-
Got some...
-
Dimpling the...
-
Doing the dimples -...
-
First completed part...
-
First test fit
-
It's finally here!
-
Splicing wire to the...
-
Decided to give it a...
Fuselage
- (19)
-
More work on the...
-
A little progress on...
-
Happy day - one fuel...
-
Starting to work on...
-
Gasket Material for...
-
Built a center...
-
Setting up the...
-
FInally finished the...
-
I *think* I am...
-
Oops - forgot to put...
-
Rear Seat Backs
-
Powder coat the...
-
Rear Seat Bottom
-
Rudder pedals
-
Another 80 rivnuts
-
Much easier time...
-
Finished the rudder...
-
Parachute Rocket...
-
Burned by the...
Firewall
- (2)
-
Woo hoo! Hanging the...
-
Prepping for the engine
Tail Feathers
Wings
- (11)
-
(Re)Did some work on...
-
Is it leaktight?
-
Putting the Al rims...
-
Finished the left flap
-
Match drilling the...
-
Attaching the...
-
Time to make some...
-
Fixed the Rivnut, kinda
-
Half Flaps
-
Rivnuts for some...
-
Last bit of work...
Controls
- (10)
-
Aileron Links and an...
-
The control tube...
-
Autopilot servos!
-
Re-did the steering...
-
The ailerons - glad...
-
Center Console...
-
Elevator and flap...
-
Long elevator pushrod
-
Ay-ay-eyebolts,...
-
Had some time to...
Avionics
- (4)
-
More pictures of the...
-
The guts are going in
-
Final payment
-
First call with...
Lighting
Instrument Panel
Landing Gear
- (1)
-
Thems the brakes....
Engine
- (2)
-
More engine plumbing!
Propeller
Fuel System
Interior Finish
- (2)
-
Carpeting is mostly...
-
Getting the heating...
Paint / Decals
- (1)
-
It's starting to...
Inspection
- (2)
-
I'm official now!
-
Got my tail number -...
Tools
- (9)
-
Built some tables,...
-
Just a quick...
-
Right angle drill head
-
Build the Sling wing...
-
Shortening the Rivets
-
Difference between...
-
Finally broke down...
-
Needed new Rivet gun...
-
Catch all for tools
Overall
- (8)
-
Paying for avionics,...
-
The drive south and...
-
Loading up for a move
-
Happy and sad day -...
-
Finally finished...
-
Big day today - got...
-
The rest of the kit...
-
Bought a Sling...
Seats
- (7)
-
Upholstery is...
-
Inner seat rails...
-
Rear Seat belts...
-
Finishing the Dzus...
-
Putting the rear...
-
FINALLY got the Dzus...
-
First pass at the...
Builder Name:
Edward Hefter
-
Project:
SlingTSI
-
VIEW REPORTS
Total Hours:
478.65
Total Flight Time:
Start/Last Date:
Sep 22, 2020 - No Finish Date
Engine:
Rotax 915iS
Propeller:
Airmaster 3 Blade Constant Speed propeller
Panel:
G3X
Friendly URL:
https://eaabuilderslog.org?s=EH-SlingTSI
Home or Last Project Picture
Apr 29, 2024
The tail feathers are in place
- (5 hours)
Category: Empennage
The empennage is installed. Getting close to that first engine start, and getting very excited!
There in the distance - the tail is installed
Looking good!
Elevator works!
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.